Case Study | Oslo Follo
Line Norway

Anchored tunnel gaskets
Oslo Follo Line Norway

The topographical conditions in Norway mean that the country’s infrastructure is insufficiently developed for efficient passenger and freight transport. The unique and large-scale “Follo Line” project includes the longest railway tunnel in Norway to date and resolves a bottleneck in the transport network between Oslo and Ski. Modern tunnel constructions will connect the cities for faster and more convenient transport. The new high-speed line with top speeds of up to 250 km/h reduces travel time by 50 %. Most of the route runs underground along the Oslo Akershus Fjord. The two parallel tunnels each measuring 20 km must withstand a maximum water pressure of 16.5 bar.

The challenge in this project

The high water pressure, the particularly hard rock and a tightly controlled project management process posed great challenges for all those involved. For example, there were three production lines running in parallel in the prefabrication plant in order to provide tunnel segments for four tunnel boring machines in a timely manner. There were also specific environmental regulations which meant, among other issues, that led to choose an anchored solution over a bonded seal.

Solution and benefits

Our SEALABLE (previously Datwyler) sealing solution was created specially for this project, tested in our own technical centre and then tested again at STUVA. The required tightness of 33 bar could be proven with a safety factor of two.

  • Accelerated manufacturing process through the use of anchored seals
  • Accuracy of fit through adapted sealing corners
  • Environmentally friendly
  • STUVA leak testing

If we want to remain sustainable, we cannot simply say: We’ll do it the way we’ve always done it [...]

Project Manager Anne Kathrine Kalager

Impressions

concrete tunnel segment with gaskets from SEALABLE
Transport of tunnel segments in the underground
tunnel boring machine at Oslo Follo Line project
the team at the entrance of the tunnel Oslo Follo Line project
transport car for the tunnel segments at Oslo Follow Line project
Tuebbing machine with a tunnel segment at Oslo Follo Linde project
Workers attach the gaskets from SEALABLE at Oslo Follo Line project
Tuebbing segments stacked at Oslo Follow Line project
tunnel side view Oslo Follo Line project
tunnel vision at Oslo Follo Line project

Related Links

Our services

Icon für den Service von Berechnungen

CALCULATIONS

Icon für den Service von Prüfungen

TESTS

Icon für den Service hauseigenes Technikum

LABORATORY

Icon für den Vor-Ort-Service

ON-SITE-SERVICE

Your contact person

Oliver Pasemann
Research & Development Tunnelling

Language: ENG / GER

+49 152 5313 2247
Mark Fischer
Application Engineer Tunnelling

Language: ENG / GER

+49 151 1464 8844

Copyright 2024. All Rights Reserved.